My gc job is taking really long.
I started the prune job on 6th of February (took less than 1 day) and started gc job on 7th of feb.
Now the gc is at 50% (on phase1).
I'm still on 1.0.6 (because on February 1.0.8 wasn't released) .
Is there a way to speedup this job?
My storage is getting really near to be full (95% out of 80TB) - so can I partly start the gc manually to start deleting the first "old backups"?
best regards
My gc job is taking really long.
I started the prune job on 6th of February (took less than 1 day) and started gc job on 7th of feb.
Now the gc is at 50% (on phase1).
I'm still on 1.0.6 (because on February 1.0.8 wasn't released) .
Is there a way to speedup this job?
My storage is getting really near to be full (95% out of 80TB) - so can I partly start the gc manually to start deleting the first "old backups"?