Hi,
I have 2 PBS each on separate site, lets say A and B. All datastores are synced between them but i have missing chunk on a fresh synced datastore on B pulled from A, on a specific snapshot.
It seem B dosent try to pull missing chunk if i try to sync again from A despite he know he have missing data, is there any way to force him to resync the missings chunks ? When i start the sync, he consider everything is up to date and do nothing, i dont understand that ...
I would like to avoid to recreate complete datastore and sync from 0, network between these 2 are not very fast.
( Sorry for my bad english )
Thanks
I have 2 PBS each on separate site, lets say A and B. All datastores are synced between them but i have missing chunk on a fresh synced datastore on B pulled from A, on a specific snapshot.
It seem B dosent try to pull missing chunk if i try to sync again from A despite he know he have missing data, is there any way to force him to resync the missings chunks ? When i start the sync, he consider everything is up to date and do nothing, i dont understand that ...
I would like to avoid to recreate complete datastore and sync from 0, network between these 2 are not very fast.
( Sorry for my bad english )
Thanks