How do I tell the system to back up on certain days of the week at the same time? (Monday, Wednesday, Friday, Saturday) Do I have to write 3 jobs for this? Monday to Friday is controlled with mon..fri 21:00. but I don't get the 4 days scheduled?
mon.wed.fri.sat 21:00 is not working
thx EDSTOBI
mon.wed.fri.sat 21:00 is not working
thx EDSTOBI