Hi there,
not sure if this is the right way, but let's try
One thing that bugged me for quite some time is that when migrating VMs between nodes with local storage, no progress indicator is given. I understand that maybe forecasting an overall percentage etc. might be not as easy as expected (various network parameters involved etc.), but it would be helpful if for the migration job of a storage device of the VM at least some progress of the copying job could be shown in the task details (amount of data written), similar to the status when performing a backup?
Right now we're doing our migration forecasting based on Network load, but which is not as accurate as it should be, as you can imagine.
Thanks!
not sure if this is the right way, but let's try
One thing that bugged me for quite some time is that when migrating VMs between nodes with local storage, no progress indicator is given. I understand that maybe forecasting an overall percentage etc. might be not as easy as expected (various network parameters involved etc.), but it would be helpful if for the migration job of a storage device of the VM at least some progress of the copying job could be shown in the task details (amount of data written), similar to the status when performing a backup?
Right now we're doing our migration forecasting based on Network load, but which is not as accurate as it should be, as you can imagine.
Thanks!