EDIT: Already known bug
Not sure if this is already known, or if I'm just reading it wrong...
The verify job task Status tab shows a duration of 9h 34.7s and the actual last duration was 2m 1s as seen correctly in the Verify Jobs schedule.
I attached the output of the job log as well showing it only took 2 minutes.
Really not a big deal, but wasn't sure if I was just reading it wrong, have something configured wrong, or if it's an actual bug.
see https://bugzilla.proxmox.com/show_bug.cgi?id=5753 , which is basically the same issue
Not sure if this is already known, or if I'm just reading it wrong...
The verify job task Status tab shows a duration of 9h 34.7s and the actual last duration was 2m 1s as seen correctly in the Verify Jobs schedule.
I attached the output of the job log as well showing it only took 2 minutes.
Really not a big deal, but wasn't sure if I was just reading it wrong, have something configured wrong, or if it's an actual bug.
Attachments
Last edited: