What am I missing with the setup?
We've got a single tape drive which multiple tapes used throughout the week.
On the first occurrence, they work without any issue, however when they next run they determine the tapes the wrong label:
Checking for media 'Tuesday' in drive 'LTO8'
wrong media label Tuesday (some-guid)
Please insert media 'Tuesday' into drive 'LTO8'
The media pool allocation is set to always, retention set to overwrite and backup job set to eject media.
What I want to happen is that the second run overwrites the first tape and writes the subsequent backup to it, then the week after it repeats, etc.
We've got a single tape drive which multiple tapes used throughout the week.
On the first occurrence, they work without any issue, however when they next run they determine the tapes the wrong label:
Checking for media 'Tuesday' in drive 'LTO8'
wrong media label Tuesday (some-guid)
Please insert media 'Tuesday' into drive 'LTO8'
The media pool allocation is set to always, retention set to overwrite and backup job set to eject media.
What I want to happen is that the second run overwrites the first tape and writes the subsequent backup to it, then the week after it repeats, etc.