Hi! I currently operate a production PVE7 cluster of three nodes for an internal development team. Due to energy saving demands my boss wants to run all VMs/CTs on one cluster node and temporarily shut down the two then empty nodes. As each of the nodes has plenty of RAM/ressources and we additionaly could switch off lots of VMs/CTs (but need to keep them), migrating and running everything on one node should practically work from a client/boss perspective.
When turning two third of the cluster nodes off the cluster has no quorum and is limited - not able to even perform backups. What is the recommended way of running a configuration like this? If possible I want to keep the cluster setup intact as it will definitely be reutilizied in the future.
Thanks a lot.
When turning two third of the cluster nodes off the cluster has no quorum and is limited - not able to even perform backups. What is the recommended way of running a configuration like this? If possible I want to keep the cluster setup intact as it will definitely be reutilizied in the future.
Thanks a lot.