Hi Guys
I'm a little unsure what method I should be using to prune old backup jobs.
On my Datacenter => Backup schedules I have this retention period set for each backup job.

And on the proxmox backup server I did have the following in the Prune Jobs.

Am I meant to use one or the other and not both?
I'm a little unsure what method I should be using to prune old backup jobs.
On my Datacenter => Backup schedules I have this retention period set for each backup job.

And on the proxmox backup server I did have the following in the Prune Jobs.

Am I meant to use one or the other and not both?
Last edited: