Hi Guys

I'm a little unsure what method I should be using to prune old backup jobs.

On my Datacenter => Backup schedules I have this retention period set for each backup job.

1740954061968.png


And on the proxmox backup server I did have the following in the Prune Jobs.

1740954154538.png

Am I meant to use one or the other and not both?
 
Last edited:
Most of us are using the pruning jobs in PBS.
It's easier to keep track of there, because its all in one place.

If you have a job that pushes data to a NAS instead of a PBS, definitely setup pruning in the backup job.

@tcabernoch Thank you for your reply. Yes I do have a NAS attached as the storage point so I'll do as you suggested.
 