Ideally i would like to get the following setup done for most production VMs:
Monday to Friday: "mon..fri"
between 06:30 and 19:30: ?
Once per hour: */1:00
Starting Time: has this to be set by the 06:30 parameter or the 19:30 parameter ? So if i want to have Job1 run at 0630 and Job2 run at 06:40 and Job3 Run at 06:50 - how would i go about that ?
Is there something like the https://pbs.proxmox.com/docs/prune-simulator/ for the Scheduler ? Or a description how the parameters work ?
Monday to Friday: "mon..fri"
between 06:30 and 19:30: ?
Once per hour: */1:00
Starting Time: has this to be set by the 06:30 parameter or the 19:30 parameter ? So if i want to have Job1 run at 0630 and Job2 run at 06:40 and Job3 Run at 06:50 - how would i go about that ?
Is there something like the https://pbs.proxmox.com/docs/prune-simulator/ for the Scheduler ? Or a description how the parameters work ?