Just testd the Datacenter Manager to migrate from one cluster to another.
Actually it would work. But the problem is that we have the following network situation:
But when we do a migration initiated by the datacenter manager the GBit interface is used (NET x.x.1.0/24).
I've got the feeling that this is because the datacenter manger is in the same 1Gbit network as the MGMT (NET x.x.1.0/24)
Actually it would work. But the problem is that we have the following network situation:
- 1GBit for MGMT and Corosync subnet (NET x.x.1.0/24)
- 2x LACP 25 GBit for data
- including migration network (which works fine in the cluster) (NET x.x.2.0/24)
- including second corosync
- 2x LACP 25 GBit for storage
But when we do a migration initiated by the datacenter manager the GBit interface is used (NET x.x.1.0/24).
I've got the feeling that this is because the datacenter manger is in the same 1Gbit network as the MGMT (NET x.x.1.0/24)