I have been hunting for this in the documentation, but I do not see this specifically explained in detail: How does PDM handle these migrations? Does the migration happen through the PDM system, or does it make a direct connection between the two nodes?
In my network, I have separated the Migration/Backup network from the management network, and the Migration/Backup network is 10G, whereas management is 1G; I was planning on PDM to only have access to the 1G management network, but I cannot seem to find any clear explanation of whether PDM needs access to that 10G migration network, or just the Hosts require it. If PDM handles migration by passing through the host, then that complicates things a bit.
Thanks all!
In my network, I have separated the Migration/Backup network from the management network, and the Migration/Backup network is 10G, whereas management is 1G; I was planning on PDM to only have access to the 1G management network, but I cannot seem to find any clear explanation of whether PDM needs access to that 10G migration network, or just the Hosts require it. If PDM handles migration by passing through the host, then that complicates things a bit.
Thanks all!