Hello!
Thanks in advance for any input. Ive been reading a lot of posts about the minimum requirements for Ceph with Promox. Im planning a cluster and would like an opinion on whether or not it would be adequate or cutting it too close. Some say 3 nodes is fine, some say 5 is the minimum so its hard for me to reach a consensus.:
Three node cluster with identical specs per node:
Intel Xeon W1250 / 64GB RAM
OS drive: 250GB M.2
Ceph drives: 2x 4TB Micron 5200 ECO (plp enterprise grade SSD)
Managment network: 1Gb
VM network: 10Gb
Ceph network: 25Gb full mesh direct attached
I would use replication and not erasure coding in this setup.
Im not opposed to ZFS with replication if the specs of this cluster are simply not enough to run Ceph properly.
Thank you!
Thanks in advance for any input. Ive been reading a lot of posts about the minimum requirements for Ceph with Promox. Im planning a cluster and would like an opinion on whether or not it would be adequate or cutting it too close. Some say 3 nodes is fine, some say 5 is the minimum so its hard for me to reach a consensus.:
Three node cluster with identical specs per node:
Intel Xeon W1250 / 64GB RAM
OS drive: 250GB M.2
Ceph drives: 2x 4TB Micron 5200 ECO (plp enterprise grade SSD)
Managment network: 1Gb
VM network: 10Gb
Ceph network: 25Gb full mesh direct attached
I would use replication and not erasure coding in this setup.
Im not opposed to ZFS with replication if the specs of this cluster are simply not enough to run Ceph properly.
Thank you!