Hello,
as the topic tells: I need some help as i'm quite new to the topic of tape backups.
We have a PBS saving around 8TB of machines (last snapshot) per day.
Our media pool should have 4-5 friday/weekend-tapes (full) and 4 weektime tapes for incremential changes to keep the duration low.
Right now, i configured the pool to alway allocate and 7 days retention.
That's obviously wrong as every tape seems to get all data.
I should set allocate to friday evening, correct?
As we do not have a changer, how need holidays to be handled?
F.e. if friday is a holiday (nobody will change the tape then) - can we just put in the friday-tape on thursday?
When having multiple friday-tapes, this one would get overwritten on thursday already, because it's already over 7 days old.
Or would it used as a full-backup on thursday AND get the incremential changes on friday automatically?
As u see, i'm quite a bit unsure about the terms and concepts used here and need some advice.
Kind regards
Stephan
as the topic tells: I need some help as i'm quite new to the topic of tape backups.
We have a PBS saving around 8TB of machines (last snapshot) per day.
Our media pool should have 4-5 friday/weekend-tapes (full) and 4 weektime tapes for incremential changes to keep the duration low.
Right now, i configured the pool to alway allocate and 7 days retention.
That's obviously wrong as every tape seems to get all data.
I should set allocate to friday evening, correct?
As we do not have a changer, how need holidays to be handled?
F.e. if friday is a holiday (nobody will change the tape then) - can we just put in the friday-tape on thursday?
When having multiple friday-tapes, this one would get overwritten on thursday already, because it's already over 7 days old.
Or would it used as a full-backup on thursday AND get the incremential changes on friday automatically?
As u see, i'm quite a bit unsure about the terms and concepts used here and need some advice.
Kind regards
Stephan