Hello everyone!
My MB Intel s2600wf supports Intel VMD Tech which I using it for NVME raid.
But i have a problem with GPU passthrough. If you see hyperlinks bellow (dmesg) it show that IOMMU module loaded earlier than VMD load self driver that initilized GPU and RAID controller (with 32-bit PCI domain), and all these devices not have any IOMMU group. Can you advise me anything?
dmesg | grep -i iommu
dmesg | grep -i vmd
My MB Intel s2600wf supports Intel VMD Tech which I using it for NVME raid.
But i have a problem with GPU passthrough. If you see hyperlinks bellow (dmesg) it show that IOMMU module loaded earlier than VMD load self driver that initilized GPU and RAID controller (with 32-bit PCI domain), and all these devices not have any IOMMU group. Can you advise me anything?
dmesg | grep -i iommu
dmesg | grep -i vmd
Last edited: