k+m calculation is the number of OSDs or the number of hosts if I choose domain failure = host? Or is there an easier way to determine it, I don't really understand how to determine the right one
For example, I have 10 nodes and each node has 5 drives, and the drive capacity is 3.8TB, how do I...