Intention
We have to replace 3 aging Hyper-V Servers, hosting total of 45 virtual machines, most of them not very busy. Most not very important, except for DC/ADFS and stuff.
New Hardware available
2x Dell R650xs, 1x CPU Intel(R) Xeon(R) Silver 4310, 12 cores, 192GB RAM, PERC H755 Front (Embedded) Controller
2x HP DL360 Gen10, 1x CPU Intel(R) Xeon(R) Silver 4208 CPU, 8 cores, 192GB RAM, HPE P408i-a Controller
Each server has one 480GB SSD, two 2TB SSDs. The all have a dual-port 10GBE card.
Possibility to add more RAM/CPU/Disk is here.
Idea
Would it make sense to create a proxmox cluster with ceph? Add all the 2TB SSDs for ceph?
Or rather go for local ZFS storage? The old Hyper-V servers had local storage only and it was ok. And for one migration a month I can live with a few minutes to migrate.
I have no experience with ceph yet, proxmox a little. I know about ZFS, Debian, esxi and similar stuff.
I wonder if this will get to complicated, as it is not my main job, I just happen to be the guy that has an idea..
I read about having a minimum of 7 nodes for ceph, others running production on 3 nodes.. What would you recommend in this case?
We have to replace 3 aging Hyper-V Servers, hosting total of 45 virtual machines, most of them not very busy. Most not very important, except for DC/ADFS and stuff.
New Hardware available
2x Dell R650xs, 1x CPU Intel(R) Xeon(R) Silver 4310, 12 cores, 192GB RAM, PERC H755 Front (Embedded) Controller
2x HP DL360 Gen10, 1x CPU Intel(R) Xeon(R) Silver 4208 CPU, 8 cores, 192GB RAM, HPE P408i-a Controller
Each server has one 480GB SSD, two 2TB SSDs. The all have a dual-port 10GBE card.
Possibility to add more RAM/CPU/Disk is here.
Idea
Would it make sense to create a proxmox cluster with ceph? Add all the 2TB SSDs for ceph?
Or rather go for local ZFS storage? The old Hyper-V servers had local storage only and it was ok. And for one migration a month I can live with a few minutes to migrate.
I have no experience with ceph yet, proxmox a little. I know about ZFS, Debian, esxi and similar stuff.
I wonder if this will get to complicated, as it is not my main job, I just happen to be the guy that has an idea..
I read about having a minimum of 7 nodes for ceph, others running production on 3 nodes.. What would you recommend in this case?