This is on the regular Proxmox 8.2.2 and not a Proxmox Backup Server but when creating or editing backup jobs there is no obvious way to alter the schedule for when the backup jobs will run. Just seems to be a predetermine list of entries with no Edit button.
Clicking on 'Help' on that panel just talks about the options of doing the backups themselves instead of the timing.
So are we forced to use that list of timing options? It seems strangely inflexible when a simple calendar/time control would have done the job.
Any advice on this? If I am missing something it's certainly not obvious from a UI standpoint
Clicking on 'Help' on that panel just talks about the options of doing the backups themselves instead of the timing.
So are we forced to use that list of timing options? It seems strangely inflexible when a simple calendar/time control would have done the job.
Any advice on this? If I am missing something it's certainly not obvious from a UI standpoint