i manually started some backup while there was some load on the pbs disks and got "corrupted double-linked list" error once on backup.
the second backup run afterwards ran fine and validating the backup did not show any error
should i worry ?
what does this error mean ?
...
NFO: 27% (452.0 MiB of 1.6 GiB) in 3s, read: 150.7 MiB/s, write: 145.3 MiB/s
INFO: 46% (760.0 MiB of 1.6 GiB) in 6s, read: 102.7 MiB/s, write: 101.3 MiB/s
INFO: 65% (1.0 GiB of 1.6 GiB) in 9s, read: 101.3 MiB/s, write: 101.3 MiB/s
INFO: 85% (1.4 GiB of 1.6 GiB) in 12s, read: 109.3 MiB/s, write: 101.3 MiB/s
INFO: 100% (1.6 GiB of 1.6 GiB) in 15s, read: 77.3 MiB/s, write: 65.3 MiB/s
INFO: Waiting for server to finish backup validation...
INFO: backup was done incrementally, reused 30.49 GiB (95%)
INFO: transferred 1.59 GiB in 24 seconds (67.7 MiB/s)
INFO: adding notes to backup
INFO: Finished Backup of VM 101 (00:00:25)
INFO: Backup finished at 2025-09-16 12:40:58
INFO: Backup job finished successfully
corrupted double-linked list
the second backup run afterwards ran fine and validating the backup did not show any error
should i worry ?
what does this error mean ?
...
NFO: 27% (452.0 MiB of 1.6 GiB) in 3s, read: 150.7 MiB/s, write: 145.3 MiB/s
INFO: 46% (760.0 MiB of 1.6 GiB) in 6s, read: 102.7 MiB/s, write: 101.3 MiB/s
INFO: 65% (1.0 GiB of 1.6 GiB) in 9s, read: 101.3 MiB/s, write: 101.3 MiB/s
INFO: 85% (1.4 GiB of 1.6 GiB) in 12s, read: 109.3 MiB/s, write: 101.3 MiB/s
INFO: 100% (1.6 GiB of 1.6 GiB) in 15s, read: 77.3 MiB/s, write: 65.3 MiB/s
INFO: Waiting for server to finish backup validation...
INFO: backup was done incrementally, reused 30.49 GiB (95%)
INFO: transferred 1.59 GiB in 24 seconds (67.7 MiB/s)
INFO: adding notes to backup
INFO: Finished Backup of VM 101 (00:00:25)
INFO: Backup finished at 2025-09-16 12:40:58
INFO: Backup job finished successfully
corrupted double-linked list