Hi
I've created a small spreadsheet to calculate the minimal resources needed to deal with a node failure.
Please check it out. Is this correct? Did I miscalculated something? These are absolutely the minimal resources needed.
To test the sheet, please make a copy. Only fill in the yellow cells.
https://docs.google.com/spreadsheets/d/1Xwa8dQ6WWOqhsA9MF1YsgPJxaR8IiqUUEuGq0Sb377k/edit?usp=sharing
I've created a small spreadsheet to calculate the minimal resources needed to deal with a node failure.
Please check it out. Is this correct? Did I miscalculated something? These are absolutely the minimal resources needed.
To test the sheet, please make a copy. Only fill in the yellow cells.
https://docs.google.com/spreadsheets/d/1Xwa8dQ6WWOqhsA9MF1YsgPJxaR8IiqUUEuGq0Sb377k/edit?usp=sharing